Maintenance of ecological balance and a pristine environment is of utmost importance to KVK Energy.

Driven by its commitment for sustainable growth of power, KVK Energy defined environment management policy and sound environment practices for minimizing environmental impact arising out of setting up of power plants and preserving the natural ecology.

While deciding the appropriate technology for its projects, KVK Energy integrates many environmental provisions into the plant design. In order to ensure that the company comply with all the stipulated environment norms, various state-of-the-art pollution control systems and devices are incorporated.

The company follows strict guidelines to ensure safety for one and all. After detailed risk analysis, well thought out on-site and off-site emergency plans are kept in place, and mock drills are conducted at regular intervals.

Inside the plants, there are officers who ensure that safety standards are followed at all times by all.

Safety posters and slogans are displayed throughout the plants. Safety workbook and safety manual of the division have been given to all contractors and workmen to ensure safety in their respective divisions. There are safety training modules for the illiterate labour too.



KVK Nilachal Power Pvt Ltd received a clearance from Ministry of Environment & Forests (MoEF).
EPC Contract & BTG contract with NCC & CSEPDI
KNPL has received coal linkage for 1000 MW
3x350 Ph-1 of 4x350 MW Coal based Thermal Power Project in Kandarei, Athagarh Tehsil, District Cuttack, Orissa by M/s KVK Nilachal Power Pvt. Ltd. - Change in Stack Height - Relaxation in EC conditions regarding
KNPL has Issued NTP to EPC Contractor (NCC).
KNPL has achieved all major clearances.
KVK Group has ventured into Wind Power and has signed for  1.5 MW with Regen Power Tech Pvt Ltd.
Signed an MoA with Government of Arunachal Pradesh to execute Par Hydro Electric Project of 65 MW & Dardu Hydro Electric Project of 60 MW on BOOT basis.
The SVPPL project has received all required statutory clearances.
KVK Group has received ISO Certification.
 

KVK Energy has 4 operating power plants and is currently implementing / developing several new projects.

read more
 